Wednesday 18 December 2013

Its been nearly 2 months since the last post and Brad has done sooo much work on the bus. There was a big delay with the duralite delivery and we are still waiting on some things to arrive. In the meantime he has done ran all electrical wires, ran the water pipes, installed the hot water system, lined the walls and roof in the back half of the bus with the duralite wall panels, made the frames for the kids beds and did a fair bit of stuff underneath the bus. Like making spaces for the generator, gas bottles, water tanks, batteries etc. And installing the outdoor kitchen. 




Then the duralite panels arrived and it was full steam ahead



Pretty pleased with her desk

Shower, toilet, basin

 

Kids bunks, our bed, and cupboards, we are still waiting on the hinges so no doors yet;